Describe the system in plain English. Get an NEC-checked one-line diagram, a ten-sheet permit package, and a seal anyone can verify.
No CAD. No symbol libraries. Type what you are installing and the AI drafts the whole thing.
27 component types, each a typed node with ports, specs and conductor data. Edit anything; the schedules and sheets follow.
Live checks against NEC 2017 – 2026: string voltage, conductor derating, busbar 705.12, rapid shutdown. One click fixes and rechecks.
Cover, site plan, structural criteria, three-line, colour-coded wiring, equipment & panel schedules, NEC label schedule and a compliance review — as a print-ready PDF.
Every set carries a tamper-evident fingerprint and a QR code. Scan it and the drawing proves it has not been altered since sealing.